construction

project description:

The decking for this bridge was constructed using 1.5mm Hi-Tensile Galvanised Presto Panel. Supplied in 12.00 metre lengths and interlocked to give maximum coverage and rigidity. The bridge spans a river; the requirement was increased load bearing weight with minimal supporting structure. It needed to sustain the weight of wet concrete and provide reinforcement to the whole structure, whilst having fewer ground supports. Refer to page 17 of the Presto Handbook for analysis of the load bearing weight of Presto Panel.

Why Presto Panel is the best solution:

Presto Panel is strong and it is versatile. Manufactured from quality hi-tensile steel, it has the edge in strength and longevity. Lengths can be rolled according to specification, which makes it ideal for on-site construction.